CHALLENGE

  • Large part size
  • High fill pressure
  • Robotic load and unload
  • Test cycle time

SOLUTION

  • Fully automated system
  • Dual chambers, pumping systems, leak detectors
  • Four filling and loading positions
  • Automated gas connection to tank
  • Stacked design to reduce footprint